Water canals (Aqueducts)

2024

Material performance & Performance installation

Calcium chloride (salt), copper powder, Jesmonite AC100, quadaxial stitched glassdust sheet, vinegar, ammonium, wood, bolts and screws, room conditions, and environmental variables

The duration varies depending on room humidity, temperature, and air flow.

The performance is estimated to take a minimum of 8-10 weeks, potentially unending

Size is variable: min: 160x100x40 cm max: 400x400x300 cm

Day 4 and 14 of the third canal

Day 1 of the third canal - Day 21 of the second canal and Day 14 of the third canal

Photo by: Ted Fetherstonhaugh
Photo by: Ted Fetherstonhaugh